In just 40 weeks, Van Mourik Bouw realized the design of Bim Moddelleur, commissioned by GA1 B.V. (NL), a concrete factory. This factory has a GFA of 33,000 m2 and contains a company hall, office space, concrete plant, distribution center and a concrete cellar with an area of 5,000 m2 with a depth of 5 meters. Van Mourik Bouw opted for glazing around the office spaces in order to create an open atmosphere.

Details

The entire roof of Bosch Beton is equipped with solar panels. In addition, the building has trusses of a 50 meters span. The overhead crane has the same span and the beams of this crane are more than 2 meters high.

The reception area is decorated with a wall plate including a photo, which covers the height of the entire floor.

Details

Industrial hall, concrete factory and distribution center in total 33,000 m2 GFA
Hal: 32,0000 m2 BVO
Office: 1,000 m2 GFA
Concrete cellar: 5,000 m2 BVO