Linflowers - Zuilichem

Linflowers developed a seven-hectare greenhouse complex for chrysanthemums in Nieuwaal. For this project, Mourik Bouw constructed, among other things, a new industrial building and office with a loading bay, the foundation for the W.O.T., and an underground flower transport tunnel.

Bijzonderheden

The underground flower transport tunnel is designed as a double tunnel capable of accommodating two conveyor belts. The tunnel runs beneath the greenhouse aisle and is 365 meters long. Over the years, Van Mourik Bouw has developed a particular expertise in constructing these tunnels.

Details

  • Production hall with sandwich cladding and a brick parapet. The exterior of the office features a curved design.
  • 2,463 m² total gross floor area
  • 2,330 m² gross floor area for the production hall
  • 133 m² gross floor area for office spaces